应用科学研究进展 开放获取

抽象的

Minimizing Rental Cost for Specially Structured Two Stage Flow Shop Scheduling, Processing Time, Setup Time Associated With Probabilities Including Weightage of Jobs

Deepak Gupta, Shashi Bala and Payal Singla

This paper is an attempt to develop a new heuristic algorithm, an alternative to the traditional algorithm proposed by Johnson (1954) to find the optimal schedule of jobs to minimize the utilization time of the machines and hence, their rental cost for two stage specially structured flow shop scheduling under specified rental policy in which processing times, set up times are associated with their respective probabilities including weightage of jobs. In most of literature the processing times are always considered to be random, but there are significant situations in which processing times are not merely random but bear a well defined structural relationship to one another. A numerical illustration is given to support the algorithm.

免责声明: 此摘要通过人工智能工具翻译,尚未经过审核或验证